Southwest High School Renovations (Phase 2)

The design scope encompassed the main entry lobby, main corridors, student restrooms, mall (dining, gathering, circulation), and new health careers facilities.
Kai’s work on this campus also included the Phase 1 and Phase 3 renovations.

Lobby - After Phase 2 Renovations

Lobby - After Phase 2 Renovations

Lobby - Before

Lobby - Before

School logo digitized for custom tile mosaic at Lobby

School logo digitized for custom tile mosaic at Lobby

After - New facilities for the Health Professions Academy

After - New facilities for the Health Professions Academy

Before

Before

View inside the new Health Professions Academy during construction

View inside the new Health Professions Academy during construction

Outside Student Restrooms - After

Outside Student Restrooms - After

Outside Student Restrooms - Before

Outside Student Restrooms - Before

Wall tile pattern

Wall tile pattern

Corridor - After

Corridor - After

Corridor - Before

Corridor - Before

Mall - After Custom linear light fixture designed by Kai. The orange color and dynamic shape draws from a flick of a flame, as from the breath of a dragon, the SWHS mascot.

Mall - After
Custom linear light fixture designed by Kai. The orange color and dynamic shape draws from a flick of a flame, as from the breath of a dragon, the SWHS mascot.

Mall - Before

Mall - Before

Mall Elevation

Mall Elevation

Mall - After

Mall - After

Mall - Before

Mall - Before

Previous
Previous

A. J. Briesemeister Middle School

Next
Next

Artpace Facility Reenvisioning